| Assessment Year | 2000 |
|---|---|
| Principal Product | Oriented Structural Board |
| NAICS |
n/a
|
| SIC | 2493: Reconstituted Wood Products |
| Sales Range | $10 M to 50M |
| # of Employees | 140 |
| Plant Area |
271,800
ft2
|
| Annual Production | 401,000
thousand feet
|
| Production Hrs. Annual | 8,472
hrs
|
| Location (State) | Minnesota |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,104,646 | 43,451,642 |
kWh
|
$0.025 |
| Electricity Demand | $593,940 | 66,288 |
kW-mo/yr
|
$8.96 |
| Electricity Fees | $(-115,849.0) | - |
|
- |
| Natural Gas | $185,395 | 69,068 |
MMBtu
|
$2.68 |
| LPG | $12,293 | 3,900 |
MMBtu
|
$3.15 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $40,858 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,986 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,922 | $5,987 |
$2,331
93,200
kWh
|
$1,591
-
kW-mo/yr
|
- | - | |
| 02 | 2.7135: Install occupancy sensors | $1,741 | $2,484 |
$1,741
69,754
kWh
|
- | - | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $22,182 | $53,350 |
$22,182
887,456
kWh
|
- | - | - | |
| 04 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $871 | $511 |
$581
23,154
kWh
|
$290
-
kW-mo/yr
|
- | - | |
| 05 | 2.4322: Use or replace with energy efficient substitutes | $7,115 | $6,647 |
$2,868
114,889
kWh
|
$4,247
-
kW-mo/yr
|
- | - | |
| 06 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $5,027 | $18,608 |
$(-8.0)
(-293)
kWh
|
$(-667.0)
-
kW-mo/yr
|
$2,307
-
MMBtu
|
$3,395
-
MMBtu
|
|
| TOTAL RECOMMENDED | $40,858 | $87,587 |
$29,695
1,188,160
kWh
|
$5,461
-
kW-mo/yr
|
$2,307
-
MMBtu
|
$3,395
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $7,986 | $7,158 |
$3,449
138,043
kWh
|
$4,537
-
kW-mo/yr
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs