Assessment Year | 2000 |
---|---|
Principal Product | Oriented Structural Board |
NAICS |
n/a
|
SIC | 2493: Reconstituted Wood Products |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
271,800
ft2
|
Annual Production | 401,000
thousand feet
|
Production Hrs. Annual | 8,472
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,104,646 | 43,451,642 |
kWh
|
$0.025 |
Electricity Demand | $593,940 | 66,288 |
kW-mo/yr
|
$8.96 |
Electricity Fees | $(-115,849.0) | - |
|
- |
Natural Gas | $185,395 | 69,068 |
MMBtu
|
$2.68 |
LPG | $12,293 | 3,900 |
MMBtu
|
$3.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $40,858 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,986 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,922 | $5,987 |
$2,331
93,200
kWh
|
$1,591
-
kW-mo/yr
|
- | - | |
02 | 2.7135: Install occupancy sensors | $1,741 | $2,484 |
$1,741
69,754
kWh
|
- | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $22,182 | $53,350 |
$22,182
887,456
kWh
|
- | - | - | |
04 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $871 | $511 |
$581
23,154
kWh
|
$290
-
kW-mo/yr
|
- | - | |
05 | 2.4322: Use or replace with energy efficient substitutes | $7,115 | $6,647 |
$2,868
114,889
kWh
|
$4,247
-
kW-mo/yr
|
- | - | |
06 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $5,027 | $18,608 |
$(-8.0)
(-293)
kWh
|
$(-667.0)
-
kW-mo/yr
|
$2,307
-
MMBtu
|
$3,395
-
MMBtu
|
|
TOTAL RECOMMENDED | $40,858 | $87,587 |
$29,695
1,188,160
kWh
|
$5,461
-
kW-mo/yr
|
$2,307
-
MMBtu
|
$3,395
-
MMBtu
|
||
TOTAL IMPLEMENTED | $7,986 | $7,158 |
$3,449
138,043
kWh
|
$4,537
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs