ITAC Assessment: UA0309
ITAC logo
ITAC Assessment: UA0309
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Tracked Vechicle Components
NAICS 332111: Iron and Steel Forging
SIC 3462: Iron and Steel Forgings
Sales Range $100
M
to 500
M
# of Employees 172
Plant Area 331,000
ft2
Annual Production 410,659
units
Production Hrs. Annual 6,000
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,144,948 11,626,884
kWh
Electricity Fees $45,019 -
Natural Gas $276,321 26,537
MMBtu
TOTAL YEARLY COSTS $1,466,288
RECOMMENDED SAVINGS* $186,397 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $25,548 $400 $24,582
249,567
kWh
$966
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,157 $1,293 $1,113
11,297
kWh
$44
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,700 $26,588 $4,522
45,904
kWh
$178
04 2.9114: Use solar heat to make electricty $154,992 $2,220,000 $149,131
1,514,019
kWh
$5,861
TOTAL RECOMMENDED $186,397 $2,248,281 $179,348
1,820,787
kWh
$7,049
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs