| Assessment Year | 2025 |
|---|---|
| Principal Product | Airplane Parts Repair |
| NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
| SIC | 3724: Aircraft Engines and Engine Parts |
| Sales Range | $50 M to 100M |
| # of Employees | 200 |
| Plant Area |
120,000
ft2
|
| Annual Production | 40,000
units
|
| Production Hrs. Annual | 6,288
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $979,491 | 9,430,974 |
kWh
|
$0.10 |
| Natural Gas | $7,991 | 575 |
MMBtu
|
$13.90 |
| TOTAL YEARLY COSTS | $987,482 | |||
| RECOMMENDED SAVINGS* | $208,391 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $129,998 | $1,628,940 |
$129,998
1,251,182
kWh
|
|
| 02 | 2.7232: Replace existing hvac unit with high efficiency model | $51,128 | $122,356 |
$51,128
492,084
kWh
|
|
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,981 | $4,771 |
$2,981
28,693
kWh
|
|
| 04 | 2.7261: Install timers and/or thermostats | $371 | $482 |
$371
3,571
kWh
|
|
| 05 | 2.2437: Recover waste heat from equipment | $11,512 | $21,363 |
$11,512
110,799
kWh
|
|
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,289 | $670 |
$8,289
79,778
kWh
|
|
| 07 | 2.7135: Install occupancy sensors | $3,160 | $603 |
$3,160
30,415
kWh
|
|
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $753 | $3,317 |
$753
7,251
kWh
|
|
| 09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $199 | $86 |
$199
1,913
kWh
|
|
| TOTAL RECOMMENDED | $208,391 | $1,782,588 |
$208,391
2,005,686
kWh
|
||
| TOTAL IMPLEMENTED | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs