Assessment Year | 2025 |
---|---|
Principal Product | Wood Kitchen Cabinet |
NAICS | 337110: Wood Kitchen Cabinet and Countertop Manufacturing |
SIC | 2434: Wood Kitchen Cabinets |
Sales Range | $100 M to 500M |
# of Employees | 196 |
Plant Area |
152,000
ft2
|
Annual Production | 338,000
units
|
Production Hrs. Annual | 4,100
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $236,520 | 3,134,978 |
kWh
|
$0.075 | |
Electricity Demand | $158,934 | 11,911 |
kW-mo/yr
|
$13.34 | |
Electricity Fees | $14,046 | - |
|
- | |
Natural Gas | $85,744 | 70,319 |
MMBtu
|
$1.22 | |
Waste Disposal Costs | |||||
Water Usage | $6,891 | 7 |
Tgal
|
$984.43 | |
TOTAL YEARLY COSTS | $502,135 | ||||
RECOMMENDED SAVINGS* | $239,817 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $165,904 | $2,630,520 |
$154,636
2,050,874
kWh
|
$5,580
-
kW-mo/yr
|
$5,688 | |
02 | 2.3212: Optimize plant power factor | $38,546 | $5,696 | - | - | $38,546 | |
03 | 2.4239: Eliminate or reduce compressed air usage | $15,160 | $28,210 |
$7,638
101,300
kWh
|
$7,002
-
kW-mo/yr
|
$520 | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,778 | $7,744 |
$2,399
31,816
kWh
|
$1,249
-
kW-mo/yr
|
$130 | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,389 | $670 |
$1,528
20,267
kWh
|
$1,745
-
kW-mo/yr
|
$116 | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,275 | $16,734 |
$6,299
83,548
kWh
|
$3,624
-
kW-mo/yr
|
$352 | |
07 | 2.7261: Install timers and/or thermostats | $2,765 | $316 |
$2,670
35,417
kWh
|
- | $95 | |
TOTAL RECOMMENDED | $239,817 | $2,689,890 |
$175,170
2,323,222
kWh
|
$19,200
-
kW-mo/yr
|
$45,447 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs