ITAC Assessment: UA0289
ITAC logo
ITAC Assessment: UA0289
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Automotive Parts
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 155
Plant Area 250,000
ft2
Annual Production 5,500,000
units
Production Hrs. Annual 5,760
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $754,939 9,345,987
kWh
Electricity Demand $109,414 22,031
kW-mo/yr
Electricity Fees $43,109 -
Natural Gas $228,495 25,640
MMBtu
TOTAL YEARLY COSTS $1,135,957
RECOMMENDED SAVINGS* $665,274 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $330,998 $8,608,788 $307,928
3,810,985
kWh
$7,335
-
kW-mo/yr
$15,735 -
02 2.3212: Optimize plant power factor $6,141 $6,733 - - $6,141 -
03 2.4231: Reduce the pressure of compressed air to the minimum required $19,427 $1,000 $16,614
205,618
kWh
$1,889
-
kW-mo/yr
$924 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $26,555 $8,591 $23,245
287,690
kWh
$2,048
-
kW-mo/yr
$1,262 -
05 2.2437: Recover waste heat from equipment $3,789 $22,563 - - - $3,789
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,369 $17,266 $4,294
53,145
kWh
$820
-
kW-mo/yr
$255 -
07 2.7135: Install occupancy sensors $4,334 $6,800 $4,128
51,094
kWh
- $206 -
08 2.7232: Replace existing hvac unit with high efficiency model $218,857 $1,056,464 $174,381
2,158,181
kWh
$34,074
-
kW-mo/yr
$10,402 -
09 2.7243: Improve air circulation with destratification fans / other methods $48,585 $5,495 $46,276
572,726
kWh
- $2,309 -
10 2.7261: Install timers and/or thermostats $1,219 $79 $1,161
14,374
kWh
- $58 -
TOTAL RECOMMENDED $665,274 $9,733,779 $578,027
7,153,813
kWh
$46,166
-
kW-mo/yr
$37,292 $3,789
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs