ITAC Assessment: UA0275
ITAC logo
ITAC Assessment: UA0275
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Plastics
NAICS 326199: All Other Plastics Product Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $5
M
to 10
M
# of Employees 12
Plant Area 80,000
ft2
Annual Production 4,500,000
lb
Production Hrs. Annual 2,210
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,805 297,780
kWh
Electricity Demand $25,956 2,451
kW-mo/yr
Natural Gas $1,354 67
MMBtu
LPG $12,218 408
MMBtu
Waste Disposal Costs
Water Usage $716 114
Tgal
Solid Waste (non-haz) $136,008 494,760
lb
TOTAL YEARLY COSTS $208,057
RECOMMENDED SAVINGS* $7,759 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,759

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7135: Install occupancy sensors $2,032 $377 $1,920
17,981
kWh
- $112
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,695 $11,361 $1,651
15,458
kWh
$890
-
kW-mo/yr
$154
03 2.7232: Replace existing hvac unit with high efficiency model $1,448 $4,532 $970
9,078
kWh
$395
-
kW-mo/yr
$83
04 2.7261: Install timers and/or thermostats $824 $227 $777
7,279
kWh
- $47
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $760 $310 $278
2,603
kWh
$439
-
kW-mo/yr
$43
TOTAL RECOMMENDED $7,759 $16,807 $5,596
52,399
kWh
$1,724
-
kW-mo/yr
$439
TOTAL IMPLEMENTED $7,759 $16,807 $5,596
52,399
kWh
$1,724
-
kW-mo/yr
$439
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs