ITAC Assessment: NV0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Aerosol Paints, Lubricants, and Cleaners.
NAICS
n/a
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 150,000
ft2
Annual Production 11,000,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,200 1,449,297
kWh
Natural Gas $64,207 11,505
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,074 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,436

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $4,613 $724 $4,613
58,324
kWh
-
02 2.7243: Improve air circulation with destratification fans / other methods $5,710 $1,540 - $5,710
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,503 $1,059 $1,503
18,464
kWh
-
04 2.7111: Reduce illumination to minimum necessary levels $181 - $181
2,345
kWh
-
05 2.1131: Repair faulty insulation in furnaces, boilers, etc $105 $56 - $105
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $597 $100 $597
7,620
kWh
-
07 2.2511: Insulate bare equipment $139 $172 - $139
-
MMBtu
08 2.2437: Recover waste heat from equipment $2,226 $900 - $2,226
-
MMBtu
TOTAL RECOMMENDED $15,074 $4,551 $6,894
86,753
kWh
$8,180
-
MMBtu
TOTAL IMPLEMENTED $7,436 $1,724 $5,210
65,944
kWh
$2,226
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs