ITAC Assessment: UA0271
ITAC logo
ITAC Assessment: UA0271
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Medical Instruments
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 166,500
ft2
Annual Production 150,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $732,243 4,357,866
kWh
Electricity Demand $55,684 11,748
kW-mo/yr
Electricity Fees $24,710 -
Natural Gas $5,887 326
MMBtu
TOTAL YEARLY COSTS $818,524
RECOMMENDED SAVINGS* $90,725 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $925 $377 $897
5,338
kWh
- $28 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $16,935 $24,359 $15,491
92,192
kWh
$929
-
kW-mo/yr
$515 -
03 2.7261: Install timers and/or thermostats $66,296 $2,275 $62,615
372,711
kWh
- $1,966 $1,715
-
MMBtu
04 2.7243: Improve air circulation with destratification fans / other methods $6,447 $13,906 $6,251
37,205
kWh
- $196 -
05 2.1121: Use insulation in furnaces to facilitate heating / cooling $122 $65 $118
701
kWh
- $4 -
TOTAL RECOMMENDED $90,725 $40,982 $85,372
508,147
kWh
$929
-
kW-mo/yr
$2,709 $1,715
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs