Assessment Year | 1996 |
---|---|
Principal Product | Automotive parts |
NAICS |
n/a
|
SIC | 3694: Electrical Equipment for Internal Combustion Engines |
Sales Range | $10 M to 50M |
# of Employees | 485 |
Plant Area |
142,000
ft2
|
Annual Production | 3,340,000
pieces
|
Production Hrs. Annual | 4,424
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $119,015 | 3,123,388 |
kWh
|
$0.038 |
Electricity Demand | $72,185 | 8,658 |
kW-mo/yr
|
$8.34 |
Natural Gas | $168,000 | 53,200 |
MMBtu
|
$3.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $930,172 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $927,332 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4321: Upgrade obsolete equipment | $899,930 | $2,500,000 |
$7,360
283,118
kWh
|
$9,730
-
kW-mo/yr
|
- | - | $882,840 | |
02 | 2.2442: Preheat combustion air with waste heat | $13,620 | $15,360 | - | - |
$13,620
-
MMBtu
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,130 | $600 |
$7,130
274,326
kWh
|
- | - | - | - | |
04 | 3.8211: Convert to aqueous cleaning system | $6,652 | $6,168 | - | - | - |
$6,652
-
gal
|
- | |
05 | 2.2511: Insulate bare equipment | $2,280 | $1,850 | - | - |
$2,280
-
MMBtu
|
- | - | |
06 | 2.4314: Use synthetic lubricant | $300 | - |
$60
2,345
kWh
|
$240
-
kW-mo/yr
|
- | - | - | |
07 | 2.2511: Insulate bare equipment | $260 | $27 |
$110
4,396
kWh
|
$150
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $930,172 | $2,524,005 |
$14,660
564,185
kWh
|
$10,120
-
kW-mo/yr
|
$15,900
-
MMBtu
|
$6,652
-
gal
|
$882,840 | ||
TOTAL IMPLEMENTED | $927,332 | $2,522,128 |
$14,490
557,444
kWh
|
$9,730
-
kW-mo/yr
|
$13,620
-
MMBtu
|
$6,652
-
gal
|
$882,840 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs