Assessment Year | 2023 |
---|---|
Principal Product | Asphalt |
NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
SIC | 2951: Asphalt Paving Mixtures and Blocks |
Sales Range | $5 M to 10M |
# of Employees | 28 |
Plant Area |
827,640
ft2
|
Annual Production | 260,000
ton
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $269,436 | 2,252,096 |
kWh
|
$0.12 | |
Electricity Demand | $20,785 | 4,385 |
kW-mo/yr
|
$4.74 | |
Electricity Fees | $16,291 | - |
|
- | |
Natural Gas | $1,550,711 | 190,962 |
MMBtu
|
$8.12 | |
Waste Disposal Costs | |||||
Water Usage | $9,997 | 1,395 |
Tgal
|
$7.17 | |
TOTAL YEARLY COSTS | $1,867,220 | ||||
RECOMMENDED SAVINGS* | $179,443 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $147,247 | $186,762 | - | - | - |
$147,247
-
MMBtu
|
- | |
02 | 2.2441: Preheat boiler makeup water with waste process heat | $21,248 | $98,929 | - | - | - |
$21,248
-
MMBtu
|
- | |
03 | 2.3212: Optimize plant power factor | $3,634 | $842 | - |
$3,441
-
kW-mo/yr
|
$193 | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,902 | $3,140 |
$1,708
14,277
kWh
|
$93
-
kW-mo/yr
|
$101 | - | - | |
05 | 2.7134: Use photocell controls | $2,019 | $2,438 |
$1,912
15,983
kWh
|
- | $107 | - | - | |
06 | 2.7261: Install timers and/or thermostats | $2,642 | $297 |
$2,502
20,919
kWh
|
- | $140 | - | - | |
07 | 2.8114: Change rate schedules or other changes in utility service | $751 | $251 | - | - | - | - | $751 | |
TOTAL RECOMMENDED | $179,443 | $292,659 |
$6,122
51,179
kWh
|
$3,534
-
kW-mo/yr
|
$541 |
$168,495
-
MMBtu
|
$751 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs