ITAC Assessment: UA0269
ITAC logo
ITAC Assessment: UA0269
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Asphalt
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $5
M
to 10
M
# of Employees 28
Plant Area 827,640
ft2
Annual Production 260,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $269,436 2,252,096
kWh
Electricity Demand $20,785 4,385
kW-mo/yr
Electricity Fees $16,291 -
Natural Gas $1,550,711 190,962
MMBtu
Waste Disposal Costs
Water Usage $9,997 1,395
Tgal
TOTAL YEARLY COSTS $1,867,220
RECOMMENDED SAVINGS* $179,443 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $147,247 $186,762 - - - $147,247
-
MMBtu
-
02 2.2441: Preheat boiler makeup water with waste process heat $21,248 $98,929 - - - $21,248
-
MMBtu
-
03 2.3212: Optimize plant power factor $3,634 $842 - $3,441
-
kW-mo/yr
$193 - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,902 $3,140 $1,708
14,277
kWh
$93
-
kW-mo/yr
$101 - -
05 2.7134: Use photocell controls $2,019 $2,438 $1,912
15,983
kWh
- $107 - -
06 2.7261: Install timers and/or thermostats $2,642 $297 $2,502
20,919
kWh
- $140 - -
07 2.8114: Change rate schedules or other changes in utility service $751 $251 - - - - $751
TOTAL RECOMMENDED $179,443 $292,659 $6,122
51,179
kWh
$3,534
-
kW-mo/yr
$541 $168,495
-
MMBtu
$751
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs