| Assessment Year | 2022 |
|---|---|
| Principal Product | Floor tiles |
| NAICS | 327120: Clay Building Material and Refractories Manufacturing |
| SIC | 3253: Ceramic Wall and Floor Tile |
| Sales Range | $10 M to 50M |
| # of Employees | 90 |
| Plant Area |
100,000
ft2
|
| Annual Production | 100
lb
|
| Production Hrs. Annual | 4,896
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $201,134 | 2,967,400 |
kWh
|
$0.068 |
| Electricity Demand | $126,319 | 9,929 |
kW-mo/yr
|
$12.72 |
| Electricity Fees | $13,100 | - |
|
- |
| Natural Gas | $46,585 | 8,827 |
MMBtu
|
$5.28 |
| TOTAL YEARLY COSTS | $387,138 | |||
| RECOMMENDED SAVINGS* | $19,059 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $16,146 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,681 | $14,236 |
$6,371
93,972
kWh
|
$2,938
-
kW-mo/yr
|
$372 | |
| 02 | 2.7135: Install occupancy sensors | $1,821 | $3,299 |
$1,751
25,830
kWh
|
- | $70 | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $595 | $84 |
$298
4,391
kWh
|
$274
-
kW-mo/yr
|
$23 | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,709 | $1,000 |
$1,750
25,805
kWh
|
$855
-
kW-mo/yr
|
$104 | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,756 | $9,801 |
$2,605
38,427
kWh
|
$1,007
-
kW-mo/yr
|
$144 | |
| 06 | 2.7261: Install timers and/or thermostats | $497 | $510 |
$478
7,052
kWh
|
- | $19 | |
| TOTAL RECOMMENDED | $19,059 | $28,930 |
$13,253
195,477
kWh
|
$5,074
-
kW-mo/yr
|
$732 | ||
| TOTAL IMPLEMENTED | $16,146 | $25,037 |
$10,726
158,204
kWh
|
$4,800
-
kW-mo/yr
|
$620 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs