ITAC Assessment: UA0253
ITAC logo
ITAC Assessment: UA0253
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Floor tiles
NAICS 327120: Clay Building Material and Refractories Manufacturing
SIC 3253: Ceramic Wall and Floor Tile
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 100,000
ft2
Annual Production 100
lb
Production Hrs. Annual 4,896
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $201,134 2,967,400
kWh
Electricity Demand $126,319 9,929
kW-mo/yr
Electricity Fees $13,100 -
Natural Gas $46,585 8,827
MMBtu
TOTAL YEARLY COSTS $387,138
RECOMMENDED SAVINGS* $19,059 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,146

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,681 $14,236 $6,371
93,972
kWh
$2,938
-
kW-mo/yr
$372
02 2.7135: Install occupancy sensors $1,821 $3,299 $1,751
25,830
kWh
- $70
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $595 $84 $298
4,391
kWh
$274
-
kW-mo/yr
$23
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,709 $1,000 $1,750
25,805
kWh
$855
-
kW-mo/yr
$104
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,756 $9,801 $2,605
38,427
kWh
$1,007
-
kW-mo/yr
$144
06 2.7261: Install timers and/or thermostats $497 $510 $478
7,052
kWh
- $19
TOTAL RECOMMENDED $19,059 $28,930 $13,253
195,477
kWh
$5,074
-
kW-mo/yr
$732
TOTAL IMPLEMENTED $16,146 $25,037 $10,726
158,204
kWh
$4,800
-
kW-mo/yr
$620
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs