ITAC Assessment: UA0243
ITAC logo
ITAC Assessment: UA0243
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product automotive components
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $1
M
to 5
M
# of Employees 150
Plant Area 420,000
ft2
Annual Production 2,000,000
units
Production Hrs. Annual 5,225
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $461,468 7,794,000
kWh
Electricity Demand $93,735 11,937
kW-mo/yr
Electricity Fees $47,945 -
Natural Gas $4,733 381
MMBtu
TOTAL YEARLY COSTS $607,881
RECOMMENDED SAVINGS* $72,464 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,277

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7135: Install occupancy sensors $6,816 $22,649 $6,274
105,959
kWh
- $542
02 2.7134: Use photocell controls $8,709 $24,348 $8,016
135,377
kWh
- $693
03 2.3212: Optimize plant power factor $45,219 $10,941 - - $45,219
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,058 $9,682 $5,498
92,850
kWh
$999
-
kW-mo/yr
$561
05 2.7442: Keep doors and windows shut when not on use $2,529 $100 $2,328
39,297
kWh
- $201
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,133 $4,930 $1,107
18,696
kWh
$856
-
kW-mo/yr
$170
TOTAL RECOMMENDED $72,464 $72,650 $23,223
392,179
kWh
$1,855
-
kW-mo/yr
$47,386
TOTAL IMPLEMENTED $52,277 $20,623 $5,498
92,850
kWh
$999
-
kW-mo/yr
$45,780
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs