ITAC Assessment: OK0397
ITAC logo
ITAC Assessment: OK0397
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Baler and Commercial Twine
NAICS
n/a
SIC 2298: Cordage and Twine
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 85,500
ft2
Annual Production 23,800,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $675,294 10,975,381
kWh
Natural Gas $4,573 1,148
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,943 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,883

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,633 $3,692 $1,633
26,964
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,271 $2,404 $2,271
50,996
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $16,531 $11,150 $16,531
319,168
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,448 $3,185 $3,448
72,685
kWh
05 2.4221: Install compressor air intakes in coolest locations $502 $768 $502
10,551
kWh
06 2.4231: Reduce the pressure of compressed air to the minimum required $558 - $558
11,723
kWh
TOTAL RECOMMENDED $24,943 $21,199 $24,943
492,087
kWh
TOTAL IMPLEMENTED $23,883 $20,431 $23,883
469,813
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs