Assessment Year | 2020 |
---|---|
Principal Product | Plastic Pellets |
NAICS | 325991: Custom Compounding of Purchased Resins |
SIC | 3087: Custom Compounding of Purchased Plastics Resins |
Sales Range | $100 M to 500M |
# of Employees | 78 |
Plant Area |
150,000
ft2
|
Annual Production | 328,500
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $3,017,683 | 52,116,638 |
kWh
|
$0.058 |
Electricity Demand | $357,356 | 85,044 |
kW-mo/yr
|
$4.20 |
Electricity Fees | $110,962 | - |
|
- |
TOTAL YEARLY COSTS | $3,486,001 | |||
RECOMMENDED SAVINGS* | $152,178 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,011 | $9,712 |
$15,860
273,927
kWh
|
$1,577
-
kW-mo/yr
|
$574 | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $15,270 | $16,429 |
$13,287
229,484
kWh
|
$1,497
-
kW-mo/yr
|
$486 | - | |
03 | 2.7221: Lower temperature during the winter season and vice-versa | $2,046 | $50 |
$1,981
34,217
kWh
|
- | $65 | - | |
04 | 2.7261: Install timers and/or thermostats | $2,139 | $205 |
$2,071
35,783
kWh
|
- | $68 | - | |
05 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $9,009 | $3,457 |
$7,942
137,175
kWh
|
$806
-
kW-mo/yr
|
$261 | - | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $105,703 | $46,122 |
$121,023
2,090,200
kWh
|
$12,000
-
kW-mo/yr
|
$4,376 |
$(-31,696.0)
-
MMBtu
|
|
TOTAL RECOMMENDED | $152,178 | $75,975 |
$162,164
2,800,786
kWh
|
$15,880
-
kW-mo/yr
|
$5,830 |
$(-31,696.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs