ITAC Assessment: UA0232
ITAC logo
ITAC Assessment: UA0232
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Plastic Pellets
NAICS 325991: Custom Compounding of Purchased Resins
SIC 3087: Custom Compounding of Purchased Plastics Resins
Sales Range $100
M
to 500
M
# of Employees 78
Plant Area 150,000
ft2
Annual Production 328,500
ton
Production Hrs. Annual 8,760
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,017,683 52,116,638
kWh
Electricity Demand $357,356 85,044
kW-mo/yr
Electricity Fees $110,962 -
TOTAL YEARLY COSTS $3,486,001
RECOMMENDED SAVINGS* $152,178 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $18,011 $9,712 $15,860
273,927
kWh
$1,577
-
kW-mo/yr
$574 -
02 2.4231: Reduce the pressure of compressed air to the minimum required $15,270 $16,429 $13,287
229,484
kWh
$1,497
-
kW-mo/yr
$486 -
03 2.7221: Lower temperature during the winter season and vice-versa $2,046 $50 $1,981
34,217
kWh
- $65 -
04 2.7261: Install timers and/or thermostats $2,139 $205 $2,071
35,783
kWh
- $68 -
05 2.2449: Recover heat from exhausted steam, hot air or hot water $9,009 $3,457 $7,942
137,175
kWh
$806
-
kW-mo/yr
$261 -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $105,703 $46,122 $121,023
2,090,200
kWh
$12,000
-
kW-mo/yr
$4,376 $(-31,696.0)
-
MMBtu
TOTAL RECOMMENDED $152,178 $75,975 $162,164
2,800,786
kWh
$15,880
-
kW-mo/yr
$5,830 $(-31,696.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs