Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Corrugated Boxes
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 51
Plant Area 83,000
ft2
Annual Production 160,000,000
thousand feet
Production Hrs. Annual 2,600
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,547 1,093,494
kWh
Electricity Demand $25,550 4,040
kW-mo/yr
Natural Gas $18,566 3,510
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,155 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Product Savings By-product Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $426 $60 $310
4,396
kWh
$116
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $222 $527 $156
2,052
kWh
$66
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $197 - $137
1,758
kWh
$60
-
kW-mo/yr
- -
04 4.625: Develop standard operating procedures $3,510 - - - $3,510 -
05 4.514: Re-arrange equipment layout to reduce handling costs $46,800 $4,050 - - - $46,800
TOTAL RECOMMENDED $51,155 $4,637 $603
8,206
kWh
$242
-
kW-mo/yr
$3,510 $46,800
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs