| Assessment Year | 2020 |
|---|---|
| Principal Product | Joists and Decking for Metal Buildings |
| NAICS | 332312: Fabricated Structural Metal Manufacturing |
| SIC | 3441: Fabricated Structural Metal |
| Sales Range | $100 M to 500M |
| # of Employees | 288 |
| Plant Area |
486,400
ft2
|
| Annual Production | 150,000
ton
|
| Production Hrs. Annual | 7,500
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $485,706 | 7,959,600 |
kWh
|
$0.061 |
| Electricity Demand | $407,835 | 33,408 |
kW-mo/yr
|
$12.21 |
| Electricity Fees | $(-102,624.0) | - |
|
- |
| Natural Gas | $321,436 | 28,782 |
MMBtu
|
$11.17 |
| TOTAL YEARLY COSTS | $1,112,353 | |||
| RECOMMENDED SAVINGS* | $117,945 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7261: Install timers and/or thermostats | $6,594 | $700 |
$2,728
44,703
kWh
|
- | $(-313.0) |
$4,179
-
MMBtu
|
|
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,693 | $100 |
$3,018
49,452
kWh
|
$2,284
-
kW-mo/yr
|
$(-609.0) | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $21,587 | $2,185 |
$16,977
278,213
kWh
|
$7,412
-
kW-mo/yr
|
$(-2,802.0) | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $84,652 | $115,026 |
$63,384
1,038,744
kWh
|
$32,257
-
kW-mo/yr
|
$(-10,989.0) | - | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $419 | $1,016 |
$259
4,251
kWh
|
$214
-
kW-mo/yr
|
$(-54.0) | - | |
| TOTAL RECOMMENDED | $117,945 | $119,027 |
$86,366
1,415,363
kWh
|
$42,167
-
kW-mo/yr
|
$(-14,767.0) |
$4,179
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs