Assessment Year | 2019 |
---|---|
Principal Product | Turbine Blade Coatings |
NAICS | 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
60,000
ft2
|
Annual Production | 6,500
units
|
Production Hrs. Annual | 7,500
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $226,269 | 3,661,200 |
kWh
|
$0.062 |
Electricity Demand | $114,841 | 8,907 |
kW-mo/yr
|
$12.89 |
Electricity Fees | $18,100 | - |
|
- |
Natural Gas | $303,385 | 35,616 |
MMBtu
|
$8.52 |
TOTAL YEARLY COSTS | $662,595 | |||
RECOMMENDED SAVINGS* | $56,176 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,851 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $4,041 | $3,585 |
$4,172
67,500
kWh
|
$1,857
-
kW-mo/yr
|
$320 |
$(-2,308.0)
-
MMBtu
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,933 | $50 |
$1,230
19,896
kWh
|
$606
-
kW-mo/yr
|
$97 | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,910 | $1,395 |
$1,989
32,192
kWh
|
$774
-
kW-mo/yr
|
$147 | - | - | |
04 | 2.4226: Use / purchase optimum sized compressor | $36,500 | $104,362 | - | - | - | - |
$36,500
-
gal
|
|
05 | 2.7135: Install occupancy sensors | $856 | $922 |
$813
13,162
kWh
|
- | $43 | - | - | |
06 | 2.7221: Lower temperature during the winter season and vice-versa | $5,941 | $50 |
$5,641
91,277
kWh
|
- | $300 | - | - | |
07 | 2.2437: Recover waste heat from equipment | $3,995 | $3,320 | - | - | - |
$3,995
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $56,176 | $113,684 |
$13,845
224,027
kWh
|
$3,237
-
kW-mo/yr
|
$907 |
$1,687
-
MMBtu
|
$36,500
-
gal
|
||
TOTAL IMPLEMENTED | $8,851 | $1,445 |
$7,630
123,469
kWh
|
$774
-
kW-mo/yr
|
$447 | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs