ITAC Assessment: SU0194
ITAC logo
ITAC Assessment: SU0194
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Plastic Components
NAICS 333249: Other Industrial Machinery Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area 28,349
ft2
Annual Production 74,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $179,038 2,272,440
kWh
Electricity Demand $47,143 5,035
kW-mo/yr
Natural Gas $4,009 313
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,165 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,043

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $662 - $559
6,986
kWh
$103
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $734 $11 $364
4,044
kWh
$122
-
kW-mo/yr
$248
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,623 $1,616 $4,734
59,170
kWh
$889
-
kW-mo/yr
-
04 2.2511: Insulate bare equipment $2,404 $868 $2,404
29,317
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $1,484 $576 $1,250
15,625
kWh
$234
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $136 $154 $29
368
kWh
$9
-
kW-mo/yr
$98
07 2.3512: De-energize excess transformer capacity $1,122 $2,975 $1,122
14,963
kWh
- -
TOTAL RECOMMENDED $12,165 $6,200 $10,462
130,473
kWh
$1,357
-
kW-mo/yr
$346
TOTAL IMPLEMENTED $11,043 $3,225 $9,340
115,510
kWh
$1,357
-
kW-mo/yr
$346
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs