Assessment Year | 2004 |
---|---|
Principal Product | Plastic Components |
NAICS | 333249: Other Industrial Machinery Manufacturing |
SIC | 3559: Special Industry Machinery, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 110 |
Plant Area |
28,349
ft2
|
Annual Production | 74,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $179,038 | 2,272,440 |
kWh
|
$0.079 |
Electricity Demand | $47,143 | 5,035 |
kW-mo/yr
|
$9.36 |
Natural Gas | $4,009 | 313 |
MMBtu
|
$12.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,165 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,043 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $662 | - |
$559
6,986
kWh
|
$103
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $734 | $11 |
$364
4,044
kWh
|
$122
-
kW-mo/yr
|
$248 | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,623 | $1,616 |
$4,734
59,170
kWh
|
$889
-
kW-mo/yr
|
- | |
04 | 2.2511: Insulate bare equipment | $2,404 | $868 |
$2,404
29,317
kWh
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,484 | $576 |
$1,250
15,625
kWh
|
$234
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $136 | $154 |
$29
368
kWh
|
$9
-
kW-mo/yr
|
$98 | |
07 | 2.3512: De-energize excess transformer capacity | $1,122 | $2,975 |
$1,122
14,963
kWh
|
- | - | |
TOTAL RECOMMENDED | $12,165 | $6,200 |
$10,462
130,473
kWh
|
$1,357
-
kW-mo/yr
|
$346 | ||
TOTAL IMPLEMENTED | $11,043 | $3,225 |
$9,340
115,510
kWh
|
$1,357
-
kW-mo/yr
|
$346 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs