Assessment Year | 2018 |
---|---|
Principal Product | Lost Foam Castings |
NAICS | 331524: Aluminum Foundries (except Die-Casting) |
SIC | 3365: Aluminum Foundries |
Sales Range | greater than $500 M |
# of Employees | 165 |
Plant Area |
126,000
ft2
|
Annual Production | 500,000
ton
|
Production Hrs. Annual | 5,408
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,744,142 | 28,880,871 |
kWh
|
$0.060 | |
Electricity Fees | $(-19,103.0) | - |
|
- | |
Natural Gas | $83,580 | 17,599 |
MMBtu
|
$4.75 | |
Waste Disposal Costs | |||||
Water Usage | $74,999 | 262,143 |
Tgal
|
$0.29 | |
TOTAL YEARLY COSTS | $1,883,618 | ||||
RECOMMENDED SAVINGS* | $226,651 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $20,176 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $70,570 | $200,000 |
$83,960
1,390,296
kWh
|
$(-1,553.0) |
$(-11,837.0)
-
MMBtu
|
|
02 | 2.7273: Install desiccant humidity control system | $62,836 | $165,000 |
$24,215
400,982
kWh
|
$(-448.0) |
$39,069
-
MMBtu
|
|
03 | 2.4225: Install common header on compressors | $63,989 | $119,600 |
$65,195
1,079,574
kWh
|
$(-1,206.0) | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $13,960 | $1,000 |
$14,223
235,515
kWh
|
$(-263.0) | - | |
05 | 2.2437: Recover waste heat from equipment | $6,216 | $1,912 | - | - |
$6,216
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,080 | $25,456 |
$9,251
153,183
kWh
|
$(-171.0) | - | |
TOTAL RECOMMENDED | $226,651 | $512,968 |
$196,844
3,259,550
kWh
|
$(-3,641.0) |
$33,448
-
MMBtu
|
||
TOTAL IMPLEMENTED | $20,176 | $2,912 |
$14,223
235,515
kWh
|
$(-263.0) |
$6,216
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs