ITAC Assessment: UA0176
ITAC logo
ITAC Assessment: UA0176
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Residential door assemblies
NAICS 321911: Wood Window and Door Manufacturing
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 360,000
ft2
Annual Production 875,000
units
Production Hrs. Annual 2,475
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $167,073 2,631,550
kWh
Electricity Demand $11,964 2,524
kW-mo/yr
Electricity Fees $70,500 -
Natural Gas $3,786 254
MMBtu
TOTAL YEARLY COSTS $253,323
RECOMMENDED SAVINGS* $86,638 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,414

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $29,064 $1,800 $28,182
443,888
kWh
- $882 -
02 2.7135: Install occupancy sensors $9,077 $16,027 $8,802
138,647
kWh
- $275 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $9,883 $34,772 $7,036
110,816
kWh
$2,547
-
kW-mo/yr
$300 -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,678 $38,382 $21,020
331,082
kWh
- $658 -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,273 $2,645 $6,570
103,487
kWh
$2,422
-
kW-mo/yr
$281 -
06 2.4231: Reduce the pressure of compressed air to the minimum required $5,859 $400 $3,562
56,096
kWh
$2,119
-
kW-mo/yr
$178 -
07 4.454: Modify startup/shutdown times $1,804 - - - $55 $1,749
TOTAL RECOMMENDED $86,638 $94,026 $75,172
1,184,016
kWh
$7,088
-
kW-mo/yr
$2,629 $1,749
TOTAL IMPLEMENTED $47,414 $20,472 $43,554
686,022
kWh
$2,422
-
kW-mo/yr
$1,438 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs