ITAC Assessment: UA0169
ITAC logo
ITAC Assessment: UA0169
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Sheeted Cardboard
NAICS 322212: Folding Paperboard Box Manufacturing
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $10
M
to 50
M
# of Employees 11
Plant Area 110,000
ft2
Annual Production 650,000,000
units
Production Hrs. Annual 2,000
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,338 830,880
kWh
Electricity Demand $21,680 3,326
kW-mo/yr
Electricity Fees $27,466 -
TOTAL YEARLY COSTS $102,484
RECOMMENDED SAVINGS* $12,784 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $753

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7261: Install timers and/or thermostats $5,115 $1,050 $4,889
76,147
kWh
- $226
02 2.7211: Clean and maintain refrigerant condensers and towers $3,170 $1,200 $2,013
31,357
kWh
$1,017
-
kW-mo/yr
$140
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,505 $1,115 $946
14,734
kWh
$493
-
kW-mo/yr
$66
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,365 $100 $803
12,501
kWh
$502
-
kW-mo/yr
$60
05 2.7142: Utilize higher efficiency lamps and/or ballasts $753 $2,700 $446
6,949
kWh
$274
-
kW-mo/yr
$33
06 2.7134: Use photocell controls $537 $415 $513
7,990
kWh
- $24
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $339 $100 $200
3,109
kWh
$124
-
kW-mo/yr
$15
TOTAL RECOMMENDED $12,784 $6,680 $9,810
152,787
kWh
$2,410
-
kW-mo/yr
$564
TOTAL IMPLEMENTED $753 $2,700 $446
6,949
kWh
$274
-
kW-mo/yr
$33
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs