ITAC Assessment: SF0222
ITAC logo
ITAC Assessment: SF0222
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Redwood & Douglas Fir Lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 144,000
ft2
Annual Production 39,000
thousand feet
Production Hrs. Annual 2,470
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $310,429 4,589,613
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,458 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,834

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,760 - $6,760
55,865
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,874 $2,178 $5,874
48,544
kWh
03 2.4231: Reduce the pressure of compressed air to the minimum required $17,737 $3,150 $17,737
146,588
kWh
04 2.4133: Use most efficient type of electric motors $2,187 $2,939 $2,187
18,218
kWh
05 2.7135: Install occupancy sensors $1,150 $2,400 $1,150
9,502
kWh
06 2.4112: Install soft-start to eliminate nuisance trips $8,750 $49,214 $8,750
72,314
kWh
TOTAL RECOMMENDED $42,458 $59,881 $42,458
351,031
kWh
TOTAL IMPLEMENTED $27,834 $8,489 $27,834
230,173
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs