ITAC Assessment: MI0398
ITAC logo
ITAC Assessment: MI0398
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Aluminum Products
NAICS 335999: All Other Miscellaneous Electrical Equipment and Component Manufacturing
SIC 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 52,000
ft2
Annual Production 18,800
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $551,288 3,437,808
kWh
Electricity Demand $165,484 19,689
kW-mo/yr
Electricity Fees $16,552 -
TOTAL YEARLY COSTS $733,324
RECOMMENDED SAVINGS* $80,614 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $22,694 $1,650 $18,265
114,154
kWh
$4,429
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,526 $2,020 $15,660
97,872
kWh
$4,866
-
kW-mo/yr
-
03 2.3191: Use demand controller or load shedder $12,084 $100 - - $12,084
04 2.8123: Pay utility bills on time $11,152 - - - $11,152
05 2.4112: Install soft-start to eliminate nuisance trips $5,350 $849 $4,308
26,924
kWh
$1,042
-
kW-mo/yr
-
06 2.4238: Do not use compressed air for personal cooling $5,300 $9,444 $4,266
26,663
kWh
$1,034
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,388 $4,059 $1,922
12,012
kWh
$466
-
kW-mo/yr
-
08 2.7134: Use photocell controls $1,120 $4,014 $1,120
6,997
kWh
- -
TOTAL RECOMMENDED $80,614 $22,136 $45,541
284,622
kWh
$11,837
-
kW-mo/yr
$23,236
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs