ITAC Assessment: UA0157
ITAC logo
ITAC Assessment: UA0157
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Textiles
NAICS 313210: Broadwoven Fabric Mills
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 23
Plant Area 90,000
ft2
Annual Production 1,200,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,125 1,063,728
kWh
Electricity Demand $25,783 6,745
kW-mo/yr
Electricity Fees $18,307 -
Natural Gas $51,340 3,583
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,472 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $430

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $19,132 $35,339 $15,305
156,357
kWh
$1,947
-
kW-mo/yr
$1,880 - -
02 2.2121: Increase amount of condensate returned $2,932 $5,240 - - - $2,450
-
MMBtu
$482
-
gal
03 2.2136: Install / repair insulation on steam lines $320 $215 - - - $320
-
MMBtu
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $658 $100 $551
5,624
kWh
$42
-
kW-mo/yr
$65 - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $430 $1,520 $360
3,677
kWh
$28
-
kW-mo/yr
$42 - -
TOTAL RECOMMENDED $23,472 $42,414 $16,216
165,658
kWh
$2,017
-
kW-mo/yr
$1,987 $2,770
-
MMBtu
$482
-
gal
TOTAL IMPLEMENTED $430 $1,520 $360
3,677
kWh
$28
-
kW-mo/yr
$42 - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs