ITAC Assessment: UA0148
ITAC logo
ITAC Assessment: UA0148
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Nutritional Supplements
NAICS 325411: Medicinal and Botanical Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range greater than $500
M
# of Employees 227
Plant Area 275,569
ft2
Annual Production 53,782,929
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,527,544 20,126,960
kWh
Electricity Demand $209,354 35,484
kW-mo/yr
Electricity Fees $81,010 -
Natural Gas $425,199 86,223
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $238,133 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,293

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $139,156 $91,204 $120,124
1,582,660
kWh
$12,785
-
kW-mo/yr
$6,247 -
02 2.7261: Install timers and/or thermostats $53,411 - $24,859
327,529
kWh
- $1,168 $27,384
-
MMBtu
03 2.2511: Insulate bare equipment $10,764 $14,137 $4,144
54,596
kWh
- $195 $6,425
-
MMBtu
04 2.4131: Size electric motors for peak operating efficiency $19,529 $1,740 $18,589
244,909
kWh
$66
-
kW-mo/yr
$874 -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,888 $870 $4,221
55,617
kWh
$448
-
kW-mo/yr
$219 -
06 2.4231: Reduce the pressure of compressed air to the minimum required $7,998 $100 $6,787
89,417
kWh
$892
-
kW-mo/yr
$319 -
07 2.4239: Eliminate or reduce compressed air usage $2,387 $1,800 $2,249
29,631
kWh
$33
-
kW-mo/yr
$105 -
TOTAL RECOMMENDED $238,133 $109,851 $180,973
2,384,359
kWh
$14,224
-
kW-mo/yr
$9,127 $33,809
-
MMBtu
TOTAL IMPLEMENTED $30,293 $15,877 $22,733
299,505
kWh
$66
-
kW-mo/yr
$1,069 $6,425
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs