ITAC Assessment: UA0147
ITAC logo
ITAC Assessment: UA0147
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Automotive Wiring
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3647: Vehicular Lighting Equipment
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 125,000
ft2
Annual Production 15,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,658 1,219,800
kWh
Electricity Fees $28,982 -
Natural Gas $5,183 667
MMBtu
LPG $1,857 97
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,782 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,284

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $41,366 $72,811 $31,267
425,408
kWh
$10,099 -
02 2.7135: Install occupancy sensors $1,680 $1,096 $1,270
17,280
kWh
$410 -
03 2.7134: Use photocell controls $46 $117 $35
474
kWh
$11 -
04 2.7261: Install timers and/or thermostats $3,593 $1,875 $2,716
36,946
kWh
$877 -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $960 $1,930 $726
9,880
kWh
$234 -
06 2.4231: Reduce the pressure of compressed air to the minimum required $320 $100 $242
3,297
kWh
$78 -
07 2.2437: Recover waste heat from equipment $539 $2,535 - - $539
-
MMBtu
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $278 $225 $210
2,857
kWh
$68 -
TOTAL RECOMMENDED $48,782 $80,689 $36,466
496,142
kWh
$11,777 $539
-
MMBtu
TOTAL IMPLEMENTED $1,284 $2,272 $971
13,211
kWh
$313 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs