Assessment Year | 1993 |
---|---|
Principal Product | Woodworking and Metalworking Machine |
NAICS |
n/a
|
SIC | 3553: Woodworking Machinery |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
250,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $604,900 | 9,910,610 |
kWh
|
$0.061 |
Natural Gas | $102,903 | 18,170 |
MMBtu
|
$5.66 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $29,278 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,278 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2514: Cover open tanks | $4,418 | $1,308 | - |
$4,418
-
MMBtu
|
|
02 | 2.7111: Reduce illumination to minimum necessary levels | $5,703 | $480 |
$5,703
89,390
kWh
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,346 | $4,628 |
$5,346
87,632
kWh
|
- | |
04 | 2.7442: Keep doors and windows shut when not on use | $1,562 | $2,640 |
$1,562
81,770
kWh
|
- | |
05 | 2.2312: Minimize non-essential material in heat treatment process | $3,182 | $1,320 |
$3,182
52,169
kWh
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,413 | - |
$2,413
39,566
kWh
|
- | |
07 | 2.4314: Use synthetic lubricant | $1,484 | $560 |
$1,484
24,326
kWh
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $54 | $80 |
$54
879
kWh
|
- | |
09 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,116 | - |
$5,116
-
kWh
|
- | |
TOTAL RECOMMENDED | $29,278 | $11,016 |
$24,860
375,732
kWh
|
$4,418
-
MMBtu
|
||
TOTAL IMPLEMENTED | $29,278 | $11,016 |
$24,860
375,732
kWh
|
$4,418
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs