ITAC Assessment: TN0503
ITAC logo
ITAC Assessment: TN0503
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Woodworking and Metalworking Machine
NAICS
n/a
SIC 3553: Woodworking Machinery
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 250,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $604,900 9,910,610
kWh
Natural Gas $102,903 18,170
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,278 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,278

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2514: Cover open tanks $4,418 $1,308 - $4,418
-
MMBtu
02 2.7111: Reduce illumination to minimum necessary levels $5,703 $480 $5,703
89,390
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,346 $4,628 $5,346
87,632
kWh
-
04 2.7442: Keep doors and windows shut when not on use $1,562 $2,640 $1,562
81,770
kWh
-
05 2.2312: Minimize non-essential material in heat treatment process $3,182 $1,320 $3,182
52,169
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,413 - $2,413
39,566
kWh
-
07 2.4314: Use synthetic lubricant $1,484 $560 $1,484
24,326
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $54 $80 $54
879
kWh
-
09 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,116 - $5,116
-
kWh
-
TOTAL RECOMMENDED $29,278 $11,016 $24,860
375,732
kWh
$4,418
-
MMBtu
TOTAL IMPLEMENTED $29,278 $11,016 $24,860
375,732
kWh
$4,418
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs