ITAC Assessment: CO0270
ITAC logo
ITAC Assessment: CO0270
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Plastic Luggage Parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 250
Plant Area 88,490
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $783,324 13,852,579
kWh
Natural Gas $39,924 23,347
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,660 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,870

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6124: Establish equipment maintenance schedule $2,400 $250 $2,400
42,497
kWh
-
02 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $14,790 $16,720 $14,790
596,131
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $2,020 $2,500 - $2,020
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,450 $2,850 $1,450
25,498
kWh
-
TOTAL RECOMMENDED $20,660 $22,320 $18,640
664,126
kWh
$2,020
-
MMBtu
TOTAL IMPLEMENTED $5,870 $5,600 $3,850
67,995
kWh
$2,020
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs