Assessment Year | 2015 |
---|---|
Principal Product | Steel Coatings |
NAICS | 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 69 |
Plant Area |
205,000
ft2
|
Annual Production | 174,807
pieces
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $994,428 | 27,109,600 |
kWh
|
$0.037 |
Electricity Demand | $450,876 | 58,736 |
kW-mo/yr
|
$7.68 |
Electricity Fees | $568,090 | - |
|
- |
Natural Gas | $1,318,123 | 283,867 |
MMBtu
|
$4.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $101,388 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,336 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2524: Avoid cooling of process streams or materials that must subsequently be heated | $47,379 | $42,596 | - | - | - |
$47,379
-
MMBtu
|
|
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $15,612 | $800 |
$9,058
246,949
kWh
|
$2,994
-
kW-mo/yr
|
$3,560 | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $14,141 | $27,750 |
$9,072
247,335
kWh
|
$1,504
-
kW-mo/yr
|
$3,565 | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,985 | $2,995 |
$3,558
96,989
kWh
|
$1,029
-
kW-mo/yr
|
$1,398 | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,170 | $20,711 |
$6,686
182,282
kWh
|
$3,486
-
kW-mo/yr
|
$3,998 | - | |
06 | 2.7135: Install occupancy sensors | $1,518 | $1,802 |
$1,090
29,720
kWh
|
- | $428 | - | |
07 | 2.7261: Install timers and/or thermostats | $2,583 | $80 |
$1,854
50,537
kWh
|
- | $729 | - | |
TOTAL RECOMMENDED | $101,388 | $96,734 |
$31,318
853,812
kWh
|
$9,013
-
kW-mo/yr
|
$13,678 |
$47,379
-
MMBtu
|
||
TOTAL IMPLEMENTED | $32,336 | $28,630 |
$19,984
544,821
kWh
|
$4,498
-
kW-mo/yr
|
$7,854 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs