ITAC Assessment: UA0146
ITAC logo
ITAC Assessment: UA0146
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Steel Coatings
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 69
Plant Area 205,000
ft2
Annual Production 174,807
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $994,428 27,109,600
kWh
Electricity Demand $450,876 58,736
kW-mo/yr
Electricity Fees $568,090 -
Natural Gas $1,318,123 283,867
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $101,388 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,336

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2524: Avoid cooling of process streams or materials that must subsequently be heated $47,379 $42,596 - - - $47,379
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $15,612 $800 $9,058
246,949
kWh
$2,994
-
kW-mo/yr
$3,560 -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,141 $27,750 $9,072
247,335
kWh
$1,504
-
kW-mo/yr
$3,565 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,985 $2,995 $3,558
96,989
kWh
$1,029
-
kW-mo/yr
$1,398 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $14,170 $20,711 $6,686
182,282
kWh
$3,486
-
kW-mo/yr
$3,998 -
06 2.7135: Install occupancy sensors $1,518 $1,802 $1,090
29,720
kWh
- $428 -
07 2.7261: Install timers and/or thermostats $2,583 $80 $1,854
50,537
kWh
- $729 -
TOTAL RECOMMENDED $101,388 $96,734 $31,318
853,812
kWh
$9,013
-
kW-mo/yr
$13,678 $47,379
-
MMBtu
TOTAL IMPLEMENTED $32,336 $28,630 $19,984
544,821
kWh
$4,498
-
kW-mo/yr
$7,854 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs