ITAC Assessment: UA0141
ITAC logo
ITAC Assessment: UA0141
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Pressure Treated Woods
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $100
M
to 500
M
# of Employees 99
Plant Area 87,019
ft2
Annual Production 56,251
thousand feet
Production Hrs. Annual 7,200
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $545,415 8,742,581
kWh
Electricity Demand $167,186 32,663
kW-mo/yr
Electricity Fees $39,441 -
Wood $374,000 262,992
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $203,845 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,821

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Wood Savings
01 2.2414: Use waste heat from hot flue gases to preheat $85,589 $80,000 - - - $85,589
-
MMBtu
02 2.1113: Reduce combustion air flow to optimum $59,866 $15,000 - - - $59,866
-
MMBtu
03 2.2121: Increase amount of condensate returned $36,194 $110,000 - - - $36,194
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,091 $2,522 $6,624
106,176
kWh
$1,070
-
kW-mo/yr
$397 -
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,110 $800 $2,502
40,103
kWh
$455
-
kW-mo/yr
$153 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $6,816 $7,363 $5,827
93,399
kWh
$655
-
kW-mo/yr
$334 -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,559 $421 $2,950
47,276
kWh
$435
-
kW-mo/yr
$174 -
08 2.7261: Install timers and/or thermostats $620 $250 $590
9,455
kWh
- $30 -
TOTAL RECOMMENDED $203,845 $216,356 $18,493
296,409
kWh
$2,615
-
kW-mo/yr
$1,088 $181,649
-
MMBtu
TOTAL IMPLEMENTED $11,821 $3,572 $9,716
155,734
kWh
$1,525
-
kW-mo/yr
$580 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs