Assessment Year | 2015 |
---|---|
Principal Product | organic chemicals |
NAICS | 325199: All Other Basic Organic Chemical Manufacturing |
SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 104 |
Plant Area |
3,789,720
ft2
|
Annual Production | 65,500,000
lb
|
Production Hrs. Annual | 8,064
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $919,449 | 17,695,747 |
kWh
|
$0.052 |
Electricity Demand | $180,835 | 44,694 |
kW-mo/yr
|
$4.05 |
Electricity Fees | $6,072 | - |
|
- |
Natural Gas | $1,358,471 | 366,189 |
MMBtu
|
$3.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $152,370 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,776 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2121: Increase amount of condensate returned | $62,198 | $11,224 | - | - | - |
$62,198
-
MMBtu
|
|
02 | 2.1113: Reduce combustion air flow to optimum | $15,296 | $22,500 | - | - | - |
$15,296
-
MMBtu
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $35,414 | $50 |
$30,464
586,297
kWh
|
$3,370
-
kW-mo/yr
|
$1,580 | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,776 | $2,922 |
$13,826
266,081
kWh
|
$1,246
-
kW-mo/yr
|
$704 | - | |
05 | 2.4224: Upgrade controls on compressors | $2,916 | $5,250 |
$2,786
53,611
kWh
|
- | $130 | - | |
06 | 2.4322: Use or replace with energy efficient substitutes | $17,386 | - |
$16,610
319,677
kWh
|
- | $776 | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,384 | $14,682 |
$3,233
62,215
kWh
|
- | $151 | - | |
TOTAL RECOMMENDED | $152,370 | $56,628 |
$66,919
1,287,881
kWh
|
$4,616
-
kW-mo/yr
|
$3,341 |
$77,494
-
MMBtu
|
||
TOTAL IMPLEMENTED | $15,776 | $2,922 |
$13,826
266,081
kWh
|
$1,246
-
kW-mo/yr
|
$704 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs