Assessment Year | 2014 |
---|---|
Principal Product | Automotive Electro Coating |
NAICS | 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 62 |
Plant Area |
102,000
ft2
|
Annual Production | 30,154
thousand feet
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $228,708 | 5,045,100 |
kWh
|
$0.045 |
Electricity Demand | $39,800 | 9,478 |
kW-mo/yr
|
$4.20 |
Electricity Fees | $104,602 | - |
|
- |
Natural Gas | $195,110 | 37,574 |
MMBtu
|
$5.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $43,004 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,930 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $15,715 | $35,154 | - | - | - |
$15,715
-
MMBtu
|
|
02 | 2.7313: Recycle air for heating, ventilation and air conditioning | $11,506 | $6,410 | - | - | - |
$11,506
-
MMBtu
|
|
03 | 2.7261: Install timers and/or thermostats | $2,774 | $200 |
$1,718
37,889
kWh
|
- | $667 |
$389
-
MMBtu
|
|
04 | 2.7243: Improve air circulation with destratification fans / other methods | $1,266 | - |
$(-1,230.0)
(-27,125)
kWh
|
- | - |
$2,496
-
MMBtu
|
|
05 | 2.4112: Install soft-start to eliminate nuisance trips | $6,867 | $4,120 | - |
$4,947
-
kW-mo/yr
|
$1,920 | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,986 | $2,522 |
$2,068
45,627
kWh
|
$83
-
kW-mo/yr
|
$835 | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,890 | $100 |
$1,351
29,804
kWh
|
$11
-
kW-mo/yr
|
$528 | - | |
TOTAL RECOMMENDED | $43,004 | $48,506 |
$3,907
86,195
kWh
|
$5,041
-
kW-mo/yr
|
$3,950 |
$30,106
-
MMBtu
|
||
TOTAL IMPLEMENTED | $5,930 | $300 |
$1,839
40,568
kWh
|
$11
-
kW-mo/yr
|
$1,195 |
$2,885
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs