Assessment Year | 2021 |
---|---|
Principal Product | Steel Fabrication |
NAICS | 332420: Metal Tank (Heavy Gauge) Manufacturing |
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
75,000
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 2,808
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $55,423 | 559,429 |
kWh
|
$0.099 | |
Electricity Demand | $7,199 | 2,087 |
kW-mo/yr
|
$3.45 | |
Natural Gas | $12,627 | 2,254 |
MMBtu
|
$5.60 | |
Other Gas | $25,000 | 735 |
MMBtu
|
$34.01 | |
Waste Disposal Costs | |||||
Water Usage | $1,982 | 149 |
Tgal
|
$13.30 | |
TOTAL YEARLY COSTS | $102,231 | ||||
RECOMMENDED SAVINGS* | $11,797 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $11,797 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $1,218 | $25 |
$1,218
12,295
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,059 | $585 |
$6,059
61,160
kWh
|
- | |
03 | 2.7261: Install timers and/or thermostats | $2,271 | $263 |
$2,271
22,919
kWh
|
- | |
04 | 2.7134: Use photocell controls | $647 | $185 |
$647
6,531
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,453 | $648 |
$1,256
12,679
kWh
|
$197
-
kW-mo/yr
|
|
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $149 | $565 |
$149
1,501
kWh
|
- | |
TOTAL RECOMMENDED | $11,797 | $2,271 |
$11,600
117,085
kWh
|
$197
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $11,797 | $2,271 |
$11,600
117,085
kWh
|
$197
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs