Assessment Year | 2014 |
---|---|
Principal Product | Cabinet |
NAICS | 337110: Wood Kitchen Cabinet and Countertop Manufacturing |
SIC | 2434: Wood Kitchen Cabinets |
Sales Range | $10 M to 50M |
# of Employees | 900 |
Plant Area |
1,400,000
ft2
|
Annual Production | 325,027
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,615,629 | 22,128,480 |
kWh
|
$0.073 |
Electricity Demand | $478,353 | 81,077 |
kW-mo/yr
|
$5.90 |
Wood | $878,409 | 501,948 |
MMBtu
|
$1.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $229,775 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $83,978 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Wood Savings |
---|---|---|---|---|---|---|---|
01 | 2.3321: Use steam pressure reduction to generate power | $72,413 | $8,000 |
$83,144
1,138,800
kWh
|
- |
$(-10,731.0)
-
MMBtu
|
|
02 | 2.1113: Reduce combustion air flow to optimum | $34,652 | $100 | - | - |
$34,652
-
MMBtu
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $21,794 | $38,871 |
$15,611
213,821
kWh
|
$6,183
-
kW-mo/yr
|
- | |
04 | 2.2136: Install / repair insulation on steam lines | $263 | $331 | - | - |
$263
-
MMBtu
|
|
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $44,851 | $100 |
$37,005
506,848
kWh
|
$7,846
-
kW-mo/yr
|
- | |
06 | 2.4224: Upgrade controls on compressors | $35,918 | $45,024 |
$29,298
401,290
kWh
|
$6,620
-
kW-mo/yr
|
- | |
07 | 2.4224: Upgrade controls on compressors | $15,672 | $5,250 |
$15,672
214,656
kWh
|
- | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,212 | $7,095 |
$3,596
49,261
kWh
|
$616
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $229,775 | $104,771 |
$184,326
2,524,676
kWh
|
$21,265
-
kW-mo/yr
|
$24,184
-
MMBtu
|
||
TOTAL IMPLEMENTED | $83,978 | $7,626 |
$40,601
556,109
kWh
|
$8,462
-
kW-mo/yr
|
$34,915
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Wood Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs