ITAC Assessment: UA0129
ITAC logo
ITAC Assessment: UA0129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Cabinet
NAICS 337110: Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2434: Wood Kitchen Cabinets
Sales Range $10
M
to 50
M
# of Employees 900
Plant Area 1,400,000
ft2
Annual Production 325,027
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,615,629 22,128,480
kWh
Electricity Demand $478,353 81,077
kW-mo/yr
Wood $878,409 501,948
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $229,775 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $83,978

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings
01 2.3321: Use steam pressure reduction to generate power $72,413 $8,000 $83,144
1,138,800
kWh
- $(-10,731.0)
-
MMBtu
02 2.1113: Reduce combustion air flow to optimum $34,652 $100 - - $34,652
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,794 $38,871 $15,611
213,821
kWh
$6,183
-
kW-mo/yr
-
04 2.2136: Install / repair insulation on steam lines $263 $331 - - $263
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $44,851 $100 $37,005
506,848
kWh
$7,846
-
kW-mo/yr
-
06 2.4224: Upgrade controls on compressors $35,918 $45,024 $29,298
401,290
kWh
$6,620
-
kW-mo/yr
-
07 2.4224: Upgrade controls on compressors $15,672 $5,250 $15,672
214,656
kWh
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,212 $7,095 $3,596
49,261
kWh
$616
-
kW-mo/yr
-
TOTAL RECOMMENDED $229,775 $104,771 $184,326
2,524,676
kWh
$21,265
-
kW-mo/yr
$24,184
-
MMBtu
TOTAL IMPLEMENTED $83,978 $7,626 $40,601
556,109
kWh
$8,462
-
kW-mo/yr
$34,915
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs