Assessment Year | 2014 |
---|---|
Principal Product | bolts, nuts, washers |
NAICS | 332722: Bolt, Nut, Screw, Rivet, and Washer Manufacturing |
SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
Sales Range | $10 M to 50M |
# of Employees | 124 |
Plant Area |
340,000
ft2
|
Annual Production | 35,000,000
pieces
|
Production Hrs. Annual | 4,505
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $165,955 | 2,129,400 |
kWh
|
$0.078 |
Electricity Demand | $0.0 | 10,569 |
kW-mo/yr
|
$0.000 |
Electricity Fees | $34,652 | - |
|
- |
Natural Gas | $81,559 | 6,481 |
MMBtu
|
$12.58 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,844 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,373 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,979 | $24,613 |
$11,301
144,992
kWh
|
$678 | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,756 | $800 |
$4,487
57,570
kWh
|
$269 | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,394 | $5,695 |
$4,145
53,183
kWh
|
$249 | - | |
04 | 2.7261: Install timers and/or thermostats | $4,402 | $160 |
$3,530
45,288
kWh
|
$212 |
$660
-
MMBtu
|
|
05 | 4.454: Modify startup/shutdown times | $3,313 | - | - | $3,313 | - | |
TOTAL RECOMMENDED | $28,844 | $31,268 |
$23,463
301,033
kWh
|
$4,721 |
$660
-
MMBtu
|
||
TOTAL IMPLEMENTED | $16,373 | $30,308 |
$15,446
198,175
kWh
|
$927 | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs