Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product bolts, nuts, washers
NAICS 332722: Bolt, Nut, Screw, Rivet, and Washer Manufacturing
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 124
Plant Area 340,000
ft2
Annual Production 35,000,000
pieces
Production Hrs. Annual 4,505
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $165,955 2,129,400
kWh
Electricity Demand $0.0 10,569
kW-mo/yr
Electricity Fees $34,652 -
Natural Gas $81,559 6,481
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,844 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,373

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,979 $24,613 $11,301
144,992
kWh
$678 -
02 2.4231: Reduce the pressure of compressed air to the minimum required $4,756 $800 $4,487
57,570
kWh
$269 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,394 $5,695 $4,145
53,183
kWh
$249 -
04 2.7261: Install timers and/or thermostats $4,402 $160 $3,530
45,288
kWh
$212 $660
-
MMBtu
05 4.454: Modify startup/shutdown times $3,313 - - $3,313 -
TOTAL RECOMMENDED $28,844 $31,268 $23,463
301,033
kWh
$4,721 $660
-
MMBtu
TOTAL IMPLEMENTED $16,373 $30,308 $15,446
198,175
kWh
$927 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs