ITAC Assessment: UA0117
ITAC logo
ITAC Assessment: UA0117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Injection Molding, Paint
NAICS 336360: Motor Vehicle Seating and Interior Trim Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 497
Plant Area 296,000
ft2
Annual Production 355,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,307,606 20,570,400
kWh
Electricity Demand $663,974 47,624
kW-mo/yr
Electricity Fees $(-155,038.0) -
Natural Gas $328,597 41,981
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $151,125 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,760

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7241: Install outside air damper / economizer on hvac unit $116,327 $120 $119,310
1,875,948
kWh
- $(-2,983.0) -
02 2.2437: Recover waste heat from equipment $2,244 $3,515 - - - $2,244
-
MMBtu
03 2.7224: Reduce space conditioning during non-working hours $14,760 $21,000 $15,138
238,016
kWh
- $(-378.0) -
04 2.7135: Install occupancy sensors $4,219 $1,139 $4,327
68,040
kWh
- $(-108.0) -
05 2.4226: Use / purchase optimum sized compressor $2,571 $7,675 $3,147
49,476
kWh
$(-510.0)
-
kW-mo/yr
$(-66.0) -
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,971 $800 $2,002
31,484
kWh
$1,045
-
kW-mo/yr
$(-76.0) -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,033 $1,900 $6,315
99,298
kWh
$1,924
-
kW-mo/yr
$(-206.0) -
TOTAL RECOMMENDED $151,125 $36,149 $150,239
2,362,262
kWh
$2,459
-
kW-mo/yr
$(-3,817.0) $2,244
-
MMBtu
TOTAL IMPLEMENTED $14,760 $21,000 $15,138
238,016
kWh
- $(-378.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs