ITAC Assessment: UF0161
ITAC logo
ITAC Assessment: UF0161
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Bottling Soda Products
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 150,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 5,330
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,971 1,804,220
kWh
Electricity Demand $30,636 7,331
kW-mo/yr
Natural Gas $27,556 6,492
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,847 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,998

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,316 $7,288 $3,693
65,944
kWh
$623
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $491 $6,951 $476
8,499
kWh
$15
-
kW-mo/yr
- - -
03 2.7232: Replace existing hvac unit with high efficiency model $546 $500 $377
6,741
kWh
$169
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,132 $1,000 $2,132
29,308
kWh
- - - -
05 2.2441: Preheat boiler makeup water with waste process heat $8,171 $7,500 - - $8,171
-
MMBtu
- -
06 3.4113: Treat and reuse rinse waters $816 $865 - - - $816
-
Tgal
-
07 4.321: Optimize production lot sizes and inventories $11,375 $7,000 - - - - $11,375
-
gal
TOTAL RECOMMENDED $27,847 $31,104 $6,678
110,492
kWh
$807
-
kW-mo/yr
$8,171
-
MMBtu
$816
-
Tgal
$11,375
-
gal
TOTAL IMPLEMENTED $13,998 $14,951 $2,608
37,807
kWh
$15
-
kW-mo/yr
- - $11,375
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs