ITAC Assessment: UA0112
ITAC logo
ITAC Assessment: UA0112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Tire bladders
NAICS 326211: Tire Manufacturing (except Retreading)
SIC 3011: Tires and Inner Tubes
Sales Range greater than $500
M
# of Employees 50
Plant Area 178,000
ft2
Annual Production 14,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $560,984 8,220,800
kWh
Electricity Fees $(-28,690.0) -
Natural Gas $145,208 30,936
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,407 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,562

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.4323: Use optimum size and capacity equipment $5,737 $19,304 $5,737
82,886
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,385 $2,330 $10,233
150,047
kWh
$152 -
03 2.2136: Install / repair insulation on steam lines $1,177 $878 - - $1,177
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $23,965 $49,792 $23,613
346,231
kWh
$352 -
05 2.7261: Install timers and/or thermostats $1,143 $520 $1,087
15,939
kWh
$16 $40
-
MMBtu
TOTAL RECOMMENDED $42,407 $72,824 $40,670
595,103
kWh
$520 $1,217
-
MMBtu
TOTAL IMPLEMENTED $11,562 $3,208 $10,233
150,047
kWh
$152 $1,177
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs