ITAC Assessment: UA0111
ITAC logo
ITAC Assessment: UA0111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Polystyrene containers
NAICS 326140: Polystyrene Foam Product Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $5
M
to 10
M
# of Employees 385
Plant Area 23,000
ft2
Annual Production 84,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,471,101 69,754,208
kWh
Electricity Demand $530,542 69,167
kW-mo/yr
Electricity Fees $923,396 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,740 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,740

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.6231: Utilize controls to operate equipment only when needed $6,225 $851 $4,786
135,220
kWh
- $1,439
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $42,878 $2,530 $32,070
905,947
kWh
$895
-
kW-mo/yr
$9,913
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,637 $100 $2,589
73,739
kWh
$976
-
kW-mo/yr
$1,072
TOTAL RECOMMENDED $53,740 $3,481 $39,445
1,114,906
kWh
$1,871
-
kW-mo/yr
$12,424
TOTAL IMPLEMENTED $53,740 $3,481 $39,445
1,114,906
kWh
$1,871
-
kW-mo/yr
$12,424