Assessment Year | 2013 |
---|---|
Principal Product | axle sets |
NAICS | 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | greater than $500 M |
# of Employees | 352 |
Plant Area |
164,800
ft2
|
Annual Production | 180,500
pieces
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $253,189 | 4,531,800 |
kWh
|
$0.056 |
Electricity Demand | $55,716 | 11,605 |
kW-mo/yr
|
$4.80 |
Electricity Fees | $42,487 | - |
|
- |
Natural Gas | $39,180 | 3,182 |
MMBtu
|
$12.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $50,951 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7241: Install outside air damper / economizer on hvac unit | $19,498 | $21,700 |
$17,498
313,200
kWh
|
$1,056
-
kW-mo/yr
|
$1,030 |
$(-86.0)
-
MMBtu
|
|
02 | 2.7261: Install timers and/or thermostats | $886 | $1,320 |
$699
12,507
kWh
|
- | $39 |
$148
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,584 | $41,591 |
$14,408
257,876
kWh
|
$2,251
-
kW-mo/yr
|
$925 | - | |
04 | 2.7135: Install occupancy sensors | $3,997 | $3,271 |
$3,787
67,789
kWh
|
- | $210 | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,923 | $3,729 |
$2,853
51,069
kWh
|
$(-84.0)
-
kW-mo/yr
|
$154 | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,107 | $100 |
$2,547
45,582
kWh
|
$397
-
kW-mo/yr
|
$163 | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,956 | $1,800 |
$2,507
44,869
kWh
|
$294
-
kW-mo/yr
|
$155 | - | |
TOTAL RECOMMENDED | $50,951 | $73,511 |
$44,299
792,892
kWh
|
$3,914
-
kW-mo/yr
|
$2,676 |
$62
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs