Assessment Year | 2012 |
---|---|
Principal Product | Engineered Cylinder |
NAICS | 333995: Fluid Power Cylinder and Actuator Manufacturing |
SIC | 3593: Fluid Power Cylinders and Actuators |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
70,000
ft2
|
Annual Production | 3,000
pieces
|
Production Hrs. Annual | 5,616
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $100,769 | 1,476,000 |
kWh
|
$0.068 |
Electricity Demand | $39,668 | 4,699 |
kW-mo/yr
|
$8.44 |
Electricity Fees | $5,612 | - |
|
- |
Natural Gas | $4,323 | 576 |
MMBtu
|
$7.51 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $5,820 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,078 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,610 | $1,600 |
$1,893
27,721
kWh
|
$621
-
kW-mo/yr
|
$96 | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $710 | $1,300 |
$544
7,967
kWh
|
$140
-
kW-mo/yr
|
$26 | - | |
03 | 2.7261: Install timers and/or thermostats | $2,368 | $546 |
$2,281
33,407
kWh
|
- | $87 | - | |
04 | 2.7314: Reduce ventilation air | $132 | $210 |
$55
797
kWh
|
- | $2 |
$75
-
MMBtu
|
|
TOTAL RECOMMENDED | $5,820 | $3,656 |
$4,773
69,892
kWh
|
$761
-
kW-mo/yr
|
$211 |
$75
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,078 | $1,846 |
$2,825
41,374
kWh
|
$140
-
kW-mo/yr
|
$113 | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs