| Assessment Year | 2012 |
|---|---|
| Principal Product | Engineered Cylinder |
| NAICS | 333995: Fluid Power Cylinder and Actuator Manufacturing |
| SIC | 3593: Fluid Power Cylinders and Actuators |
| Sales Range | $10 M to 50M |
| # of Employees | 70 |
| Plant Area |
70,000
ft2
|
| Annual Production | 3,000
pieces
|
| Production Hrs. Annual | 5,616
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $100,769 | 1,476,000 |
kWh
|
$0.068 |
| Electricity Demand | $39,668 | 4,699 |
kW-mo/yr
|
$8.44 |
| Electricity Fees | $5,612 | - |
|
- |
| Natural Gas | $4,323 | 576 |
MMBtu
|
$7.51 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $5,820 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,078 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,610 | $1,600 |
$1,893
27,721
kWh
|
$621
-
kW-mo/yr
|
$96 | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $710 | $1,300 |
$544
7,967
kWh
|
$140
-
kW-mo/yr
|
$26 | - | |
| 03 | 2.7261: Install timers and/or thermostats | $2,368 | $546 |
$2,281
33,407
kWh
|
- | $87 | - | |
| 04 | 2.7314: Reduce ventilation air | $132 | $210 |
$55
797
kWh
|
- | $2 |
$75
-
MMBtu
|
|
| TOTAL RECOMMENDED | $5,820 | $3,656 |
$4,773
69,892
kWh
|
$761
-
kW-mo/yr
|
$211 |
$75
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $3,078 | $1,846 |
$2,825
41,374
kWh
|
$140
-
kW-mo/yr
|
$113 | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs