ITAC Assessment: UA0091
ITAC logo
ITAC Assessment: UA0091
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Engineered Cylinder
NAICS 333995: Fluid Power Cylinder and Actuator Manufacturing
SIC 3593: Fluid Power Cylinders and Actuators
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 70,000
ft2
Annual Production 3,000
pieces
Production Hrs. Annual 5,616
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,769 1,476,000
kWh
Electricity Demand $39,668 4,699
kW-mo/yr
Electricity Fees $5,612 -
Natural Gas $4,323 576
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,820 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,078

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,610 $1,600 $1,893
27,721
kWh
$621
-
kW-mo/yr
$96 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $710 $1,300 $544
7,967
kWh
$140
-
kW-mo/yr
$26 -
03 2.7261: Install timers and/or thermostats $2,368 $546 $2,281
33,407
kWh
- $87 -
04 2.7314: Reduce ventilation air $132 $210 $55
797
kWh
- $2 $75
-
MMBtu
TOTAL RECOMMENDED $5,820 $3,656 $4,773
69,892
kWh
$761
-
kW-mo/yr
$211 $75
-
MMBtu
TOTAL IMPLEMENTED $3,078 $1,846 $2,825
41,374
kWh
$140
-
kW-mo/yr
$113 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs