ITAC Assessment: UA0090
ITAC logo
ITAC Assessment: UA0090
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Aerospace fastners
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 109
Plant Area 58,000
ft2
Annual Production 12,000,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,091 2,305,800
kWh
Electricity Demand $53,560 6,141
kW-mo/yr
Electricity Fees $9,698 -
Natural Gas $14,054 1,790
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,931 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,816

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7492: Use proper thickness of insulation on building envelope $11,862 $26,757 $11,381
171,430
kWh
- $481 -
02 2.7221: Lower temperature during the winter season and vice-versa $6,021 $2,488 $5,777
87,016
kWh
- $244 -
03 2.7442: Keep doors and windows shut when not on use $5,678 $142 $5,448
82,060
kWh
- $230 -
04 2.4231: Reduce the pressure of compressed air to the minimum required $10,518 $13,900 $6,805
102,504
kWh
$3,286
-
kW-mo/yr
$427 -
05 2.2437: Recover waste heat from equipment $6,230 $4,203 - - $240 $5,990
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,138 $2,200 $1,545
23,267
kWh
$507
-
kW-mo/yr
$86 -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $10,484 $12,249 $7,648
115,200
kWh
$2,411
-
kW-mo/yr
$425 -
TOTAL RECOMMENDED $52,931 $61,939 $38,604
581,477
kWh
$6,204
-
kW-mo/yr
$2,133 $5,990
-
MMBtu
TOTAL IMPLEMENTED $7,816 $2,342 $6,993
105,327
kWh
$507
-
kW-mo/yr
$316 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs