| Assessment Year | 2020 |
|---|---|
| Principal Product | Pipe fittings, threaded connectors, and pressure fittings |
| NAICS | 332919: Other Metal Valve and Pipe Fitting Manufacturing |
| SIC | 3494: Valves and Pipe Fittings, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 80 |
| Plant Area |
85,000
ft2
|
| Annual Production | 522,000
pieces
|
| Production Hrs. Annual | 2,375
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $56,958 | 739,935 |
kWh
|
$0.077 |
| Electricity Demand | $36,110 | 5,988 |
kW-mo/yr
|
$6.03 |
| Electricity Fees | $10,575 | - |
|
- |
| TOTAL YEARLY COSTS | $103,643 | |||
| RECOMMENDED SAVINGS* | $45,053 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $44,513 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.8121: Apply for tax-free status for energy purchases | $33,740 | $4,500 | - | - | $6,740 | - | $27,000 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,090 | $13,250 |
$2,160
27,000
kWh
|
$950
-
kW-mo/yr
|
- | $980 | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,146 | $1,950 |
$1,200
15,000
kWh
|
$246
-
kW-mo/yr
|
- | $700 | - | |
| 04 | 2.8123: Pay utility bills on time | $1,850 | - | - | - | $1,850 | - | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,512 | $2,280 |
$1,512
18,900
kWh
|
- | - | - | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,175 | $1,200 |
$816
10,200
kWh
|
$359
-
kW-mo/yr
|
- | - | - | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $540 | $25 |
$375
4,685
kWh
|
$165
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $45,053 | $23,205 |
$6,063
75,785
kWh
|
$1,720
-
kW-mo/yr
|
$8,590 | $1,680 | $27,000 | ||
| TOTAL IMPLEMENTED | $44,513 | $23,180 |
$5,688
71,100
kWh
|
$1,555
-
kW-mo/yr
|
$8,590 | $1,680 | $27,000 | ||