ITAC Assessment: AM0802
ITAC logo
ITAC Assessment: AM0802
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Pipe fittings, threaded connectors, and pressure fittings
NAICS 332919: Other Metal Valve and Pipe Fitting Manufacturing
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 85,000
ft2
Annual Production 522,000
pieces
Production Hrs. Annual 2,375
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,958 739,935
kWh
Electricity Demand $36,110 5,988
kW-mo/yr
Electricity Fees $10,575 -
TOTAL YEARLY COSTS $103,643
RECOMMENDED SAVINGS* $45,053 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,513

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $33,740 $4,500 - - $6,740 - $27,000
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,090 $13,250 $2,160
27,000
kWh
$950
-
kW-mo/yr
- $980 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,146 $1,950 $1,200
15,000
kWh
$246
-
kW-mo/yr
- $700 -
04 2.8123: Pay utility bills on time $1,850 - - - $1,850 - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,512 $2,280 $1,512
18,900
kWh
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,175 $1,200 $816
10,200
kWh
$359
-
kW-mo/yr
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $540 $25 $375
4,685
kWh
$165
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $45,053 $23,205 $6,063
75,785
kWh
$1,720
-
kW-mo/yr
$8,590 $1,680 $27,000
TOTAL IMPLEMENTED $44,513 $23,180 $5,688
71,100
kWh
$1,555
-
kW-mo/yr
$8,590 $1,680 $27,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs