Assessment Year | 2012 |
---|---|
Principal Product | Truck Seats |
NAICS | 336360: Motor Vehicle Seating and Interior Trim Manufacturing |
SIC | 2531: Public Building and Related Furniture |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
187,000
ft2
|
Annual Production | 187,500
pieces
|
Production Hrs. Annual | 3,366
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $38,014 | 586,762 |
kWh
|
$0.065 |
Electricity Fees | $34,674 | - |
|
- |
Natural Gas | $119,042 | 11,905 |
MMBtu
|
$10.00 |
Other Energy | $182,619 | 10,632 |
MMBtu
|
$17.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,817 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,582 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,086 | $29,396 |
$19,580
302,213
kWh
|
$506 | - | - | |
02 | 2.1114: Limit and control secondary combustion air in furnace | $7,370 | $1,353 | - | - |
$7,370
-
MMBtu
|
- | |
03 | 2.7261: Install timers and/or thermostats | $7,367 | $2,548 |
$7,182
110,845
kWh
|
$185 | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,694 | $800 |
$3,602
55,594
kWh
|
$92 | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,645 | $2,200 |
$1,604
24,763
kWh
|
$41 | - | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $481 | $613 |
$469
7,232
kWh
|
$12 | - | - | |
07 | 2.2437: Recover waste heat from equipment | $8,174 | $30,000 | - | - |
$7,860
-
MMBtu
|
$314 | |
TOTAL RECOMMENDED | $48,817 | $66,910 |
$32,437
500,647
kWh
|
$836 |
$15,230
-
MMBtu
|
$314 | ||
TOTAL IMPLEMENTED | $29,582 | $33,562 |
$21,653
334,208
kWh
|
$559 |
$7,370
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs