Assessment Year | 1996 |
---|---|
Principal Product | Prepared flour mixes and dough |
NAICS |
n/a
|
SIC | 2045: Prepared Flour Mixes and Doughs |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
100,000
ft2
|
Annual Production | 15,000,000
lb
|
Production Hrs. Annual | 6,400
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $74,935 | 2,612,251 |
kWh
|
$0.029 |
Electricity Demand | $51,856 | 5,926 |
kW-mo/yr
|
$8.75 |
Electricity Fees | $(-250.0) | - |
|
- |
Natural Gas | $68,619 | 14,444 |
MMBtu
|
$4.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $53,706 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $31,418 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $18,453 | - | - |
$22,053
-
kW-mo/yr
|
- | - | - | $(-3,600.0) | - | |
02 | 2.3132: Recharge batteries on during off-peak demand periods | $5,988 | $14,280 | - |
$5,988
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.8113: Purchase gas directly from a contract gas supplier | $11,172 | $500 | - | - | - | - | - | - | $11,172 | |
04 | 3.5317: Sell / offer by-product as animal feed | $7,341 | $2,500 | - | - |
$(-3,209.0)
-
MMBtu
|
- |
$14,500
-
lb
|
$(-3,950.0) | - | |
05 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $3,250 | $8,500 | - | - | - | - |
$3,250
-
lb
|
- | - | |
06 | 3.4151: Minimize water usage | $2,210 | $1,000 | - | - | - |
$2,210
-
Tgal
|
- | - | - | |
07 | 2.7135: Install occupancy sensors | $1,864 | $975 |
$1,864
61,547
kWh
|
- | - | - | - | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $834 | $1,771 |
$432
14,361
kWh
|
$402
-
kW-mo/yr
|
- | - | - | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $585 | $237 |
$408
13,482
kWh
|
$177
-
kW-mo/yr
|
- | - | - | - | - | |
10 | 2.2437: Recover waste heat from equipment | $1,061 | $1,000 | - | - |
$1,061
-
MMBtu
|
- | - | - | - | |
11 | 2.7221: Lower temperature during the winter season and vice-versa | $948 | - |
$316
10,258
kWh
|
- |
$632
-
MMBtu
|
- | - | - | - | |
TOTAL RECOMMENDED | $53,706 | $30,763 |
$3,020
99,648
kWh
|
$28,620
-
kW-mo/yr
|
$(-1,516.0)
-
MMBtu
|
$2,210
-
Tgal
|
$17,750
-
lb
|
$(-7,550.0) | $11,172 | ||
TOTAL IMPLEMENTED | $31,418 | $22,026 |
$2,612
86,166
kWh
|
$6,390
-
kW-mo/yr
|
$(-1,516.0)
-
MMBtu
|
$2,210
-
Tgal
|
$14,500
-
lb
|
$(-3,950.0) | $11,172 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs