ITAC Assessment: WI0284
ITAC logo
ITAC Assessment: WI0284
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Prepared flour mixes and dough
NAICS
n/a
SIC 2045: Prepared Flour Mixes and Doughs
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 100,000
ft2
Annual Production 15,000,000
lb
Production Hrs. Annual 6,400
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,935 2,612,251
kWh
Electricity Demand $51,856 5,926
kW-mo/yr
Electricity Fees $(-250.0) -
Natural Gas $68,619 14,444
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,706 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,418

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $18,453 - - $22,053
-
kW-mo/yr
- - - $(-3,600.0) -
02 2.3132: Recharge batteries on during off-peak demand periods $5,988 $14,280 - $5,988
-
kW-mo/yr
- - - - -
03 2.8113: Purchase gas directly from a contract gas supplier $11,172 $500 - - - - - - $11,172
04 3.5317: Sell / offer by-product as animal feed $7,341 $2,500 - - $(-3,209.0)
-
MMBtu
- $14,500
-
lb
$(-3,950.0) -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $3,250 $8,500 - - - - $3,250
-
lb
- -
06 3.4151: Minimize water usage $2,210 $1,000 - - - $2,210
-
Tgal
- - -
07 2.7135: Install occupancy sensors $1,864 $975 $1,864
61,547
kWh
- - - - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $834 $1,771 $432
14,361
kWh
$402
-
kW-mo/yr
- - - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $585 $237 $408
13,482
kWh
$177
-
kW-mo/yr
- - - - -
10 2.2437: Recover waste heat from equipment $1,061 $1,000 - - $1,061
-
MMBtu
- - - -
11 2.7221: Lower temperature during the winter season and vice-versa $948 - $316
10,258
kWh
- $632
-
MMBtu
- - - -
TOTAL RECOMMENDED $53,706 $30,763 $3,020
99,648
kWh
$28,620
-
kW-mo/yr
$(-1,516.0)
-
MMBtu
$2,210
-
Tgal
$17,750
-
lb
$(-7,550.0) $11,172
TOTAL IMPLEMENTED $31,418 $22,026 $2,612
86,166
kWh
$6,390
-
kW-mo/yr
$(-1,516.0)
-
MMBtu
$2,210
-
Tgal
$14,500
-
lb
$(-3,950.0) $11,172
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs