Assessment Year | 2012 |
---|---|
Principal Product | Plastic Decking |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 96 |
Plant Area |
100,000
ft2
|
Annual Production | 45,000,000
lb
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,248,725 | 17,342,000 |
kWh
|
$0.072 |
Electricity Demand | $219,034 | 33,886 |
kW-mo/yr
|
$6.46 |
Electricity Fees | $53,018 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $45,879 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,934 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $18,321 | $480 |
$15,847
220,068
kWh
|
$1,837
-
kW-mo/yr
|
$637 | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,884 | $6,195 |
$8,016
111,330
kWh
|
$559
-
kW-mo/yr
|
$309 | |
03 | 2.2511: Insulate bare equipment | $15,904 | $7,093 |
$15,350
213,161
kWh
|
- | $554 | |
04 | 2.7261: Install timers and/or thermostats | $981 | $364 |
$947
13,151
kWh
|
- | $34 | |
05 | 2.7135: Install occupancy sensors | $1,157 | $1,443 |
$1,117
15,510
kWh
|
- | $40 | |
06 | 2.7134: Use photocell controls | $632 | $270 |
$610
8,469
kWh
|
- | $22 | |
TOTAL RECOMMENDED | $45,879 | $15,845 |
$41,887
581,689
kWh
|
$2,396
-
kW-mo/yr
|
$1,596 | ||
TOTAL IMPLEMENTED | $19,934 | $1,114 |
$17,404
241,688
kWh
|
$1,837
-
kW-mo/yr
|
$693 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs