ITAC Assessment: UA0080
ITAC logo
ITAC Assessment: UA0080
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Plastic Decking
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 96
Plant Area 100,000
ft2
Annual Production 45,000,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,248,725 17,342,000
kWh
Electricity Demand $219,034 33,886
kW-mo/yr
Electricity Fees $53,018 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,879 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,934

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $18,321 $480 $15,847
220,068
kWh
$1,837
-
kW-mo/yr
$637
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,884 $6,195 $8,016
111,330
kWh
$559
-
kW-mo/yr
$309
03 2.2511: Insulate bare equipment $15,904 $7,093 $15,350
213,161
kWh
- $554
04 2.7261: Install timers and/or thermostats $981 $364 $947
13,151
kWh
- $34
05 2.7135: Install occupancy sensors $1,157 $1,443 $1,117
15,510
kWh
- $40
06 2.7134: Use photocell controls $632 $270 $610
8,469
kWh
- $22
TOTAL RECOMMENDED $45,879 $15,845 $41,887
581,689
kWh
$2,396
-
kW-mo/yr
$1,596
TOTAL IMPLEMENTED $19,934 $1,114 $17,404
241,688
kWh
$1,837
-
kW-mo/yr
$693
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs