ITAC Assessment: UA0068
ITAC logo
ITAC Assessment: UA0068
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Plastic Medical Supplies
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $5
M
to 10
M
# of Employees 173
Plant Area 115,000
ft2
Annual Production 9,999,999,999
units
Production Hrs. Annual 3,094
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $296,299 4,883,380
kWh
Electricity Demand $109,035 9,755
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,724 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,289

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7261: Install timers and/or thermostats $16,400 $5,100 $15,020
165,729
kWh
- $1,380
02 2.4235: Remove or close off unneeded compressed air lines $15,438 $13,988 $14,138
241,822
kWh
- $1,300
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,210 $4,238 $7,420
126,949
kWh
$1,930
-
kW-mo/yr
$860
04 2.7142: Utilize higher efficiency lamps and/or ballasts $12,451 $46,341 $7,325
125,319
kWh
$4,077
-
kW-mo/yr
$1,049
05 2.7122: Disconnect ballasts $3,015 $607 $929
15,900
kWh
$1,832
-
kW-mo/yr
$254
06 2.7135: Install occupancy sensors $1,210 $2,719 $1,108
18,954
kWh
- $102
TOTAL RECOMMENDED $58,724 $72,993 $45,940
694,673
kWh
$7,839
-
kW-mo/yr
$4,945
TOTAL IMPLEMENTED $44,289 $65,429 $36,483
532,870
kWh
$4,077
-
kW-mo/yr
$3,729
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs