Assessment Year | 2001 |
---|---|
Principal Product | Plating and grinding of chrome-coated pieces |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $500 k to 1M |
# of Employees | 11 |
Plant Area |
4,080
ft2
|
Annual Production | 1,600
units
|
Production Hrs. Annual | 2,428
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $40,482 | 530,000 |
kWh
|
$0.076 |
Electricity Demand | $1,690 | 1,063 |
kW-mo/yr
|
$1.59 |
Electricity Fees | $2,987 | - |
|
- |
Natural Gas | $29,867 | 4,224 |
MMBtu
|
$7.07 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,847 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,723 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7221: Lower temperature during the winter season and vice-versa | $95 | $20 |
$70
971
kWh
|
$25
-
kW-mo/yr
|
- | |
02 | 2.4133: Use most efficient type of electric motors | $16 | $22 |
$12
164
kWh
|
$4
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $110 | $265 |
$82
1,124
kWh
|
$28
-
kW-mo/yr
|
- | |
04 | 2.7145: Install skylights | $458 | $747 |
$458
6,278
kWh
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $666 | $60 |
$607
8,322
kWh
|
$59
-
kW-mo/yr
|
- | |
06 | 3.6192: Use a less expensive method of waste removal | $779 | $60 | - | - | $779 | |
07 | 3.5316: Contract a wood pallet recycling company | $576 | $60 | - | - | $576 | |
08 | 4.426: Modify workload | $2,000 | $2,640 | - | - | $2,000 | |
09 | 4.122: Develop standard procedures to improve internal yields | $16,147 | $1,786 | - | - | $16,147 | |
TOTAL RECOMMENDED | $20,847 | $5,660 |
$1,229
16,859
kWh
|
$116
-
kW-mo/yr
|
$19,502 | ||
TOTAL IMPLEMENTED | $19,723 | $4,853 |
$164
2,259
kWh
|
$57
-
kW-mo/yr
|
$19,502 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs