ITAC Assessment: UA0066
ITAC logo
ITAC Assessment: UA0066
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Carpet Textiles
NAICS 313110: Fiber, Yarn, and Thread Mills
SIC 2281: Yarn Spinning Mills
Sales Range $10
M
to 50
M
# of Employees 133
Plant Area 185,000
ft2
Annual Production 26,145,471
lb
Production Hrs. Annual 8,568
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,303,483 25,720,992
kWh
Electricity Demand $220,104 48,247
kW-mo/yr
Electricity Fees $49,265 -
Natural Gas $377,876 65,696
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $318,858 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $186,454

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $21,215 $62,771 $18,538
365,778
kWh
$2,336
-
kW-mo/yr
$341 -
02 2.7135: Install occupancy sensors $2,224 $4,767 $2,188
43,171
kWh
- $36 -
03 2.4224: Upgrade controls on compressors $22,864 $30,000 $19,987
394,382
kWh
$2,517
-
kW-mo/yr
$360 -
04 2.4231: Reduce the pressure of compressed air to the minimum required $6,677 $640 $6,572
129,675
kWh
- $105 -
05 2.2614: Use cooling tower or economizer to replace chiller cooling $22,848 $11,400 $22,481
443,612
kWh
- $367 -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $98,887 $13,568 $97,298
1,919,893
kWh
- $1,589 -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $100,439 $14,349 $98,825
1,950,006
kWh
- $1,614 -
08 2.2425: Use flue gases to heat process or service water $26,728 $64,000 - - $429 $26,299
-
MMBtu
09 2.2136: Install / repair insulation on steam lines $3,013 $1,266 - - - $3,013
-
MMBtu
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,963 $3,900 $12,403
244,736
kWh
$1,560
-
kW-mo/yr
- -
TOTAL RECOMMENDED $318,858 $206,661 $278,292
5,491,253
kWh
$6,413
-
kW-mo/yr
$4,841 $29,312
-
MMBtu
TOTAL IMPLEMENTED $186,454 $122,279 $177,279
3,498,076
kWh
$6,413
-
kW-mo/yr
$2,762 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs