Assessment Year | 1996 |
---|---|
Principal Product | Monorail Train System |
NAICS |
n/a
|
SIC | 3743: Railroad Equipment |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
52,100
ft2
|
Annual Production | 1,500
units
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $36,058 | 787,515 |
kWh
|
$0.046 |
Electricity Demand | $33,631 | 3,624 |
kW-mo/yr
|
$9.28 |
Electricity Fees | $1,623 | - |
|
- |
Natural Gas | $17,884 | 3,557 |
MMBtu
|
$5.03 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $6,097 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,155 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,155 | $600 |
$1,155
25,205
kWh
|
- | - | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $2,773 | $425 |
$1,279
27,843
kWh
|
$1,494
-
kW-mo/yr
|
- | - | |
03 | 2.7135: Install occupancy sensors | $617 | $227 |
$241
5,275
kWh
|
$376
-
kW-mo/yr
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $307 | $300 |
$307
6,741
kWh
|
- | - | - | |
05 | 2.7243: Improve air circulation with destratification fans / other methods | $845 | $1,625 | - | - |
$845
-
MMBtu
|
- | |
06 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $400 | - | - | - | - |
$400
-
lb
|
|
TOTAL RECOMMENDED | $6,097 | $3,177 |
$2,982
65,064
kWh
|
$1,870
-
kW-mo/yr
|
$845
-
MMBtu
|
$400
-
lb
|
||
TOTAL IMPLEMENTED | $1,155 | $600 |
$1,155
25,205
kWh
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs