ITAC Assessment: NV0075
ITAC logo
ITAC Assessment: NV0075
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Monorail Train System
NAICS
n/a
SIC 3743: Railroad Equipment
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 52,100
ft2
Annual Production 1,500
units
Production Hrs. Annual 2,080
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,058 787,515
kWh
Electricity Demand $33,631 3,624
kW-mo/yr
Electricity Fees $1,623 -
Natural Gas $17,884 3,557
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,097 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,155

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,155 $600 $1,155
25,205
kWh
- - -
02 2.7111: Reduce illumination to minimum necessary levels $2,773 $425 $1,279
27,843
kWh
$1,494
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $617 $227 $241
5,275
kWh
$376
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $307 $300 $307
6,741
kWh
- - -
05 2.7243: Improve air circulation with destratification fans / other methods $845 $1,625 - - $845
-
MMBtu
-
06 3.5248: Separate and recycle scrap metal to foundry or for sale $400 - - - - $400
-
lb
TOTAL RECOMMENDED $6,097 $3,177 $2,982
65,064
kWh
$1,870
-
kW-mo/yr
$845
-
MMBtu
$400
-
lb
TOTAL IMPLEMENTED $1,155 $600 $1,155
25,205
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs